Demolition projects completed:
1158+
Demolition projects completed:

1

Our Services

Residential Dwelling

Partial/Heritage Dwelling

Partial/Heritage Dwelling

Service & Repairs

Industrial Building

Energy Solar Monitoring

Commercial Demolition

 Strip out

Strip out

NEED A DEMOLITION?

Contact Us Today For Your Professional And Affordable Demolition Solution

About Us

With over 10 years of industry experience, Monash Demolition are the professional and affordable solution for your demolition or skip bin needs. We’re committed to providing a high level of customer service, and our regular clients are testament to our high quality work and customer relations.

Please call us today for a free evaluation.

Enquire Here

Our Process

Circle 1

Initial Consultation

  • Discuss with client their demolition needs and project requirements.
  • Assess the site and provide the cost estimates & timelines

Circle 2

Site Preparation

  • Disconnect utilities such as the gas and power (Or cap if partially demolishing)

Circle 3

Permitting

  • Our Team will apply for all relevant permits.
  • Assist the client with obtaining an Asset Protection permit (See FAQS)

Circle 4

Secure the Site

  • Assist client with erecting temporary fencing
  • Remove hazardous materials like Asbestos if present

Circle 5

Demolition

  • Dismantle structures safely & efficiently
  • Produce relevant certificates

Frequently Asked Questions

Usually 4 weeks from acceptance of quote. If there are protection works involved then allow 6 weeks.

An application along with a bond is paid to your relevant council. This is for the protection of council assets such as footpath and cross-over. An asset protection permit is also required for construction so it is recommended to use the same permit from demolition through to construction.

A document that requires signed consent from your neighbour when demolition work protrudes onto their boundary

If the property is built prior to 1990 it likely has asbestos externally in the eaves.
If your property is not vacant then we cannot check for internal asbestos as this requires damaging and exposing walls/ceilings/floors. In this case, we will include a provisional sum for anything internal.

What Our Clients Say

Follow us on Instagram